Small concrete pump is a special concrete pump, in the north it is mainly used for floor heating projects, in the south a large area is used in floor construction, the use of this concrete pump greatly improves the efficiency of construction, it makes the progress of the project be shortened. So how to add pistons to small concrete pumps? Now we introduce as follows:
In the treatment, first of all, you need to use 10 to 20 cement bags, roll them into a column with a diameter slightly smaller than the diameter of the conveying cylinder, a slightly pointed head, and a length of about 400 mm, bundle them with thin wires, and lightly tie the cleaning balls to the tail of the column with iron wires, and soak them with water.
Then after the concrete is pumped, the reverse pump is 1~2 cycles to eliminate the pressure in the conveying pipe, and the piston of the concrete cylinder is pressed to the last point. If it is found that there is an upward pumping and a shut-off valve, it needs to be closed first to prevent the concrete from backflowing. Next, remove the discharge pipe, open the hopper discharge door at the same time, and the reverse pump will flush the concrete in the distribution valve, concrete cylinder and hopper. Finally, after the spudger is withdrawn, the pumping is quickly started, and the water is continuously added until the column is pumped out of the output of the transport pipe.
Small concrete pumps need to be cleaned and warranted in time before and after usual use to prolong their service life and work efficiency. Generally speaking, the commonly used cleaning method for small concrete pumps is the way of washing, and the specific cleaning process is divided into six steps as follows.
The power supply of the small concrete pump is cut off, and then placed on a stable ground. Clean the hopper, box and pipe before cleaning with water to reduce the cleaning workload. Soak the sponge ball with water and plug it into the mouth of the pipe.